Temporary Full Lane Road Closure at Jalan Pangkalan Kiulap

Bandar seri begawan: Jalan Pangkalan Kiulap will be fully closed, starting on 30th November until 13th November. The temporary closure from 8 in the morning to 10 at night is to allow sewer pipe and manhole cover repair works. Road users are advised to take extra caution and comply with the traffic signs as well as speed limit.

According to Radio Television Brunei, the closure aims to facilitate essential infrastructure maintenance, ensuring the safety and functionality of the sewer system. The repair works are scheduled to take place over a span of two weeks, during which time motorists are urged to plan alternative routes to avoid inconvenience.

Authorities have emphasized the importance of adhering to posted traffic signs and speed limits in the vicinity of the roadworks. This measure is critical for the safety of both workers and road users. The public is encouraged to stay informed about the progress of the repairs and any potential changes to the schedule.