Pipe Connection Works Scheduled at Layong Water Treatment Plant

Brunei: Pipe connection works at Layong Water Treatment Plant: Pipe connection works at Layong Water Treatment Plant is being implemented on the night of 5th May.

According to Radio Television Brunei, the pipe connection works are expected to take approximately 12 hours, during which affected areas may experience disruptions in water supply or low water pressure. In Brunei Muara District, the entire Mukim Berakas 'A', several villages in Mukim Berakas 'B', Mukim Gadong 'A', Mukim Gadong 'B', Mukim Kota Batu, Mukim Sengkurong, Mukim Kilanas, and Mukim Mentiri are anticipated to be impacted.

In the Tutong District, the affected areas include Mukim Telisai, Mukim Tanjong Maya, Mukim Pekan Tutong, part of Mukim Keriam, Mukim Rambai, Mukim Kiudang, Mukim Ukong, and Mukim Lamunin. Residents in these areas are advised to plan accordingly for the temporary disruption.

For those in need of water supply during the maintenance work, Talian Darussalam 123 can be contacted to request water tankers. Additionally, blue tanks have been provided at mosque areas within the affected mukims to assist residents.